Hsiuping University of Science and Technology Institutional Repository : Item 310993100/1151
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 4334/7631
Visitors : 3181379      Online Users : 170
RC Version 3.2 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister

Please use this identifier to cite or link to this item: http://ir.hust.edu.tw/dspace/handle/310993100/1151

Title: Aggregate production planning with multiple fuzzy goals
Authors: Wang, R. C.;T. F. Liang
Date: 2005
Issue Date: 2009-01-19T07:04:31Z
Relation: International Journal of Advanced Manufacturing Technology, Vol. 25, No. 5-6, 589-597. (SCI, EI)
Appears in Collections:[Department of Industrial Engineering and Management/Graduate Institute of Lean Production Management] Journal

Files in This Item:

There are no files associated with this item.

All items in HUSTIR are protected by copyright, with all rights reserved.

 


DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback