2002-03 |
Controlling Chaos in a Symmetric Gyroscope |
Hsien-Keng Chen |
 |
2004 |
Cycle time estimation with bottleneck approach for wafer fab |
T.F. Ho; R. K. Li |
|
2006 |
Distribution planning decisions using interactive fuzzy multi-objective linear programming |
Liang, T. F. |
|
2008-03 |
DuBois & DuBois 腳部表面積估算式之研究 |
杜信宏 |
 |
2005 |
Dynamic Analysis, Controlling Chaos and Chaotification of a SMIB Power System |
Hsien-Keng Chen; Tsung-Nan Lin; Juhn-Horng Chen |
|
2001 |
Economic statistical process control over-adjusted process |
Ching-Pou Chang |
|
2001 |
The effect of imprecise measurement to the economic asymmetricand S control charts |
Ching-Pou Chang |
|
2006-07 |
THE EFFECT OF ORGANIZATIONAL PROCESS FOCUS ON SOFTWARE PROJECT TEAM PERFORMANCE, (Leon Sanders) |
Shiow-Luan Wang; Melody Wu; Wen-Chih Chiou; Chin-Chao Lin |
|
1992 |
Elastoplastic Postbuckling Behavior of Perfect and Imperfect Built-up Columns |
J. S. Chang; H. F. Sher |
|
1999 |
External failure pressure of a frangible laminated composite canister cover |
Kam, T. Y.; Wu, J. H.; Wang, W. T. |
|
1999 |
Failure analysis of a frangible laminated composite canister cover, Proc. |
Wu, J. H.; Wang, W. T.; Kam, T. Y. |
|
1997 |
Fatigue analysis of cracked aluminum plates repaired with bonded composite patches |
Kam, T. Y.; Tsai, Y. C.; Chu. K. H.; Wu, J. H. |
|
2005 |
Global Chaos Synchronization of New Chaotic Systems via Nonlinear Control |
Hsien-Keng Chen |
|
1996 |
Global Stability of a Shielded Dual-Spin Satellite |
Zheng-Ming Ge; Hsien-Keng Chen |
|
2004 |
Heuristic dispatching rule to maximize TDD and IDD performance |
T.F. Ho; R. K. Li |
|
2005 |
Hole Flanging with Multi-Action Extrusion(孔凸緣複動化擠伸成形) |
林恆勝; 吳家宏 |
|
1997 |
Improved Stability of a Dual-Spin Satellite in Circular Orbit |
Zheng-Ming Ge; Hsien-Keng Chen |
|
1993 |
“Instability and Asymptotical Stability on Partial Region in Dynamical Systems |
Zheng-Ming Ge; Chung-Wen Yao; Hsien-Keng Chen |
|
2006 |
Integrated production/ transportation planning decisions using possibilistic linear programming |
Liang, T. F.; H. W. Cheng; E. J. Wang |
|
2006 |
Integrating production-transportation planning decision with fuzzy multiple goals in supply chains |
Liang, T. F. |
|
1994 |
The Liapunov Stability of the Rotation of a Gyrostat |
Zheng-Ming Ge; Hsien-Keng Chen |
|
2006-07 |
A literature review and framework of commercial website assessment, (Dong-Her Shih), Business Opportunities and Challenges in the Innovative Age |
Chiou,W.C.; C.Perng; C.C.Lin; J.T.Tsai; S.S.Lin; S.L.Wang |
|
1999 |
Mixing macro and micro flow time estimation model:wafer fab example |
T.Y. Tseng; T.F. Ho; R. K. Li |
|
2006 |
Morphotectonics and Incision of the Kaoping Submarine Canyon, SWTaiwan Orogenic wedge. |
Chiang, C. S.; Yu, H. S. |
|
1995 |
Nonlinear and First-Ply Failure Analysis of Laminated Composite Cross-Ply Plate |
T. Y. Kam; H. F. Sher |
|