Hsiuping University of Science and Technology Institutional Repository :
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 4343/7642
Visitors : 4239073      Online Users : 19
RC Version 3.2 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Adv. Search
LoginUploadHelpAboutAdminister
Browse

Monograph [149/252]
Journal [56/185]
Research Project [20/45]
Theses and Dissertations [35/35]
Patents [30/30]

Top Upload

Loading...

Top Download

Loading...

RSS Feed RSS Feed

Jump to: [Chinese Items]   [0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
or enter the first few letters:   

Showing items 1-50 of 547. (11 Page(s) Totally)
1 2 3 4 5 6 7 8 9 10 > >>
View [10|25|50] records per page

DateTitleAuthors
2016-12-28 30W後級放大器與音質控制器之製作 廖光佑
2016-12-28 3D列印四旋翼製作 李宜陽; 洪毓懋; 葉芝鳴; 趙彥翔; 黃信富
2008-10-01 3D腳型表面資料破洞填補與腳型尺寸萃取方法 杜信宏; 游志雲
2011-12-22 5S與目視管理及現場工作合理化 劉祐嘉、何明憲、張筌彰、藍誠旺、詹文雄
2006-09 5S邁向TQM之個案研究 張燦明
2005 Aggregate production planning with multiple fuzzy goals Wang, R. C.; T. F. Liang
2002 Aggregate production planning with multiple fuzzy goals Lin, T. M.; T. F. Liang*
2023-05 AI倉儲管理 陳琮皓; 鄭光展; 林友宏; 彭昱騰
2001-03 The Analysis and Prediction of Dynamic Decision Outcomes by DBE and Causality Chang-Yi Yang
1994 Analysis of Geometrically Nonlinear Clamped Laminated Composite Plates T. Y. Kam; H. F. Sher
2004 Anti-control of Chaos in Rigid Body Motion Hsien-Keng Chen; Ching-I Lee
2004 Application of fuzzy multi-objective linear programming to aggregate production planning Wang, R. C.*; T. F. Liang
2006 Application of multiple fuzzy goals programming to project management decisions Wang, R. C.; T. F. Liang
2006 Application of possibilistic linear programming to multi-objective distribution planning decisions Liang, T. F.
2001-03 Applications of the PSI function Ψ(x) and the Dirichlet L-function to the In In tan xdx Chung-Yi Lee
2007 Applying a direct multi-granularity linguistic and strategy-oriented aggregation approach on the assessment of supply performance Sheng-Lin Chang; Reay-Chen Wang; Shih-Yuan Wang
2006 Applying fuzzy linguistic quantifier to select supply chain partners at different phases of product life cycle Sheng-Lin Chang; Reay-Chen Wang; Shih-Yuan Wang
2006 Applying interactive fuzzy multi-objective linear programming to transportation planning decisions Liang, T. F.
2005 Applying possibilistic linear programming to aggregate production planning Wang, R. C.; T. F. Liang
1999 Applying QFD to Improve Implementation Time of POS System 林亮宗
2006 Assessment of supplier performance based on product-development strategy by applying multi-granularity linguistic term sets Shih-Yuan Wang; Sheng-Lin Chang; Reay-Chen Wang
2003 Author’s Reply Hsien-Keng Chen
2005 Bifurcations and Chaos of a Two-Degree-of-Freedom Dissipative Gyroscope Hsien-Keng Chen; Zheng-Ming Ge
2003 Biomechanical analysis of the standing long jump Wen-Lan Wu; Jia-Hroung Wu; Hwai-Ting Lin; Gwo-Jaw Wang
2005 Bottleneck-based heuristic dispatching rule for optimizing mixed TDD/IDD performance in various factories T.F. Ho; R. K. Li
2002 Chaos and Chaos Synchronization of a Symmetric Gyro with Linear-Plus-Cubic Damping Hsien-Keng Chen
2006 Chaos in a New System with Fractional Order Long-Jye Sheu; Hsien-Keng Chen; Juhn-Horng Chen; Lap-Mou Tam
2006 Chaos in the Newton-Leipnik System with Fractional Order Long-Jye Sheu; Hsien-Keng Chen; Juhn-Horng Chen; Lap-Mou Tam; Wen-Chin Chen; Kuang-Tai Lin; Yuan Kang
2006 Chaotic Dynamics of the Fractionally Damped Duffing Equation Long-Jye Sheu; Hsien-Keng Chen; Juhn-Horng Chen; Lap-Mou Tam
2004 Characteristics of the wedge-top depozone of the southern Taiwan foreland basin Chiang, C. S.; Yu, H. S.; Chou, Y.W.
2002-03 Controlling Chaos in a Symmetric Gyroscope Hsien-Keng Chen
2004 Cycle time estimation with bottleneck approach for wafer fab T.F. Ho; R. K. Li
2006 Distribution planning decisions using interactive fuzzy multi-objective linear programming Liang, T. F.
2008-03 DuBois & DuBois 腳部表面積估算式之研究 杜信宏
2005 Dynamic Analysis, Controlling Chaos and Chaotification of a SMIB Power System Hsien-Keng Chen; Tsung-Nan Lin; Juhn-Horng Chen
2001 Economic statistical process control over-adjusted process Ching-Pou Chang
2001 The effect of imprecise measurement to the economic asymmetricand S control charts Ching-Pou Chang
2006-07 THE EFFECT OF ORGANIZATIONAL PROCESS FOCUS ON SOFTWARE PROJECT TEAM PERFORMANCE, (Leon Sanders) Shiow-Luan Wang; Melody Wu; Wen-Chih Chiou; Chin-Chao Lin
1992 Elastoplastic Postbuckling Behavior of Perfect and Imperfect Built-up Columns J. S. Chang; H. F. Sher
1999 External failure pressure of a frangible laminated composite canister cover Kam, T. Y.; Wu, J. H.; Wang, W. T.
2019-05-08 Facebook 與 GIS 在大台中區域媽祖信仰圈進香活動之研究- 以旱溪媽祖遶境十八庄為例 何歡; 張智量; 賴柏任; 林杰泓
1999 Failure analysis of a frangible laminated composite canister cover, Proc. Wu, J. H.; Wang, W. T.; Kam, T. Y.
1997 Fatigue analysis of cracked aluminum plates repaired with bonded composite patches Kam, T. Y.; Tsai, Y. C.; Chu. K. H.; Wu, J. H.
2005 Global Chaos Synchronization of New Chaotic Systems via Nonlinear Control Hsien-Keng Chen
1996 Global Stability of a Shielded Dual-Spin Satellite Zheng-Ming Ge; Hsien-Keng Chen
2004 Heuristic dispatching rule to maximize TDD and IDD performance T.F. Ho; R. K. Li
2005 Hole Flanging with Multi-Action Extrusion(孔凸緣複動化擠伸成形) 林恆勝; 吳家宏
1997 Improved Stability of a Dual-Spin Satellite in Circular Orbit Zheng-Ming Ge; Hsien-Keng Chen
1993 “Instability and Asymptotical Stability on Partial Region in Dynamical Systems Zheng-Ming Ge; Chung-Wen Yao; Hsien-Keng Chen
2006 Integrated production/ transportation planning decisions using possibilistic linear programming Liang, T. F.; H. W. Cheng; E. J. Wang

Showing items 1-50 of 547. (11 Page(s) Totally)
1 2 3 4 5 6 7 8 9 10 > >>
View [10|25|50] records per page

 


DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback